§ 4-803. Evaluations required  


Latest version.



  •    (a) During design. -- To save both cost and energy, the Department, in cooperation with the Maryland Energy Administration, shall project life-cycle costs and perform an energy consumption analysis during the preliminary design phase of the construction or renovation of any building.

    (b) Construction appropriation. -- Each construction appropriation shall require a State agency, including a district school board, to obtain a projection of life-cycle costs and an energy consumption analysis from the Department.


HISTORY: An. Code 1957, art. 78A, § 25A, 25C; 1985, ch. 11, § 2; 1991, ch. 468; 1993, ch. 338.