§ 5-445. Energy project -- In general  


Latest version.



  •    (a) Definitions. --

       (1) In this section the following words have the meanings indicated.

       (2) (i) "Renewable fuel" means gaseous, liquid, or solid fuel from any organic matter and its by-products.

          (ii) "Renewable fuel" includes fuel from:

             1. an agricultural crop, agricultural waste, or agricultural residue;

             2. wood, wood waste, or wood residue;

             3. animal waste;

             4. aquatic plants;

             5. sewage or sewage sludge;

             6. municipal, industrial, or commercial waste;

             7. any mixture of any of these substances with inorganic refuse from a public or private municipal waste collection system or similar disposal system; or

             8. any combination of items 1 through 7 of this item.

          (iii) "Renewable fuel" does not include fossil fuel.

       (3) "Transportation facility" means a transportation facility that is used exclusively to transport fuel produced by a fuel production facility to:

          (i) a storage facility;

          (ii) a pipeline connection to an existing pipeline or processing facility; or

          (iii) an area near the fuel production facility.

    (b) Qualifications. -- A project qualifies as an energy project if it consists of:

       (1) an energy conservation project;

       (2) a solar energy project;

       (3) the construction of a facility to produce solar energy equipment;

       (4) the construction of a facility or portion of a facility to:

          (i) produce renewable fuel; and

          (ii) burn renewable fuel, or a mixture of renewable fuel with other materials, to generate:

             1. heat;

             2. mechanical power;

             3. electricity, including by cogeneration; or

             4. other useful forms of energy;

       (5) the conversion of any facility to use renewable fuel;

       (6) the expansion or improvement of a facility that increases its capacity or efficiency to use renewable fuel;

       (7) the acquisition and improvement of equipment for use in a facility specified in items (4) through (6) of this subsection;

       (8) the acquisition or improvement of land for a facility specified in items (4) through (6) of this subsection;

       (9) the purchase, construction, or installation of a facility or equipment to use groundwater as a heat source for a heating system or as a heat sink for an air conditioning system;

       (10) the purchase, construction, or installation of a facility or equipment to develop and use the natural heat of the earth for direct use or to generate electricity;

       (11) the purchase, construction, and installation of a hydroelectric facility at an existing dam that:

          (i) uses the water power potential of the dam; and

          (ii) has no more than 30 megawatts of installed capacity;

       (12) the construction of a fuel production facility for commercial production of a gaseous, liquid, or solid fuel, or of a combination of them, that:

          (i) is produced by chemical or physical transformation of coal or mixtures of coal and other materials;

          (ii) can be used as a substitute for petroleum or natural gas, or any of their derivatives, including chemical feedstocks; and

          (iii) includes only:

             1. the fuel production facility, including the equipment, plant, supplies, and other materials associated with the fuel production facility;

             2. the land and mineral rights required directly for use in connection with the fuel production facility;

             3. any other facility or equipment to be used in the extraction of a mineral for use directly and exclusively in the fuel production facility that is necessary to the project and is:

                A. colocated with or located in the immediate vicinity of the fuel production facility; or

                B. if not colocated or located in accordance with item A of this item:

                   I. a coal mine in the case that no other reasonable source of coal is available to the project; or

                   II. incidental to the project; and

             4. any transportation facility, electric power plant, electric transmission line, or other facility that is:

                A. for the exclusive use of the project;

                B. incidental to the project; and

                C. necessary to the project;

       (13) the conversion of a facility from using petroleum-based fuel to coal or to a mixture of coal and other materials as a fuel; or

       (14) the construction of a facility to burn coal using innovative technology that increases the efficiency of the combustion process.


HISTORY: An. Code 1957, art. 83A, § 5-901(l); 2008, ch. 306, § 2; 2009, ch. 60.